Roadmap

2.13.0

Due in 37 days (09/01/2017)

24%

11 closed (23%)   36 open (77%)

2.12.4

50%

4 closed (50%)   4 open (50%)

3.0

VisIt 3.0 Release

3%

2 closed (2%)   84 open (98%)