Roadmap

2.12.3

Due in 17 days (06/12/2017)

37%

6 closed (38%)   10 open (62%)

2.13.0

28%

9 closed (26%)   25 open (74%)

3.0

VisIt 3.0 Release

3%

2 closed (2%)   85 open (98%)